Features

Features

Power Supply

Stable electricity from Cikarang Listrindo
Supplied from 3 power plants (2 active + 1 passive)
Fully redundant and independent grid from each different power plant
GTN has been achieving SLA of 100% since start of operation(2016)

Diesel Rotary Uninterruptible Power Supply (DRUPS)

DRUPS creates trustworthy electricity backup system
DRUPS is designed to be N+1 contributing to zero downtime in GTN’s history.
Power tests are conducted 2 times in a year in which power from power plants is completely shut down and power is supplied by only DRUPS.
72 hours non-stop operation without refuel.
DRUPS creates a green environment, using no hazardous material.

Security

24/7 by 7 layer security supported by Japanese security company “SECOM”.
360° sensors of outside wall, CCTV, Man Trap Gate etc. are protecting your IT property.

Building

High quality building constructed by KAJIMA, the Japanese largest construction firm. GTN is the only one DC in Indonesia constructed by Japanese constructor.

Business Continuity Plan (BCP) rooms

Various size of BCP rooms are prepared. These rooms can be used as either permanent or temporary without fee.

Cafetaria and relax room at Lounge Building

Customer can relax in the cafetaria located at Lounge Building right next to our data center and colocation. Bedding also prepared for the team in such case overnight work is needed.

Network Carrier

Multi network carriers provide services in GTN.
Customer can choose carriers that suit its request.
3 different routes to data center

Network Carrier

Multi network carriers provide services in GTN.
Customer can choose carriers that suit its request.
3 different routes to data center

Copyright 2019 Graha Teknologi Nusantara.